CP 399 3,5L Grey
Acrylic primer MIX IT 2K HS 4:1
CP 399 MixIT in grey, available in a 3.5L pack, is a high-end primer that provides excellent coverage and reliable corrosion protection. Its creamy consistency allows for an extremely smooth surface that is easy to sand. The product has a high performance, making it ideal for a variety of repairs and is also suitable for wet-on-wet application.
The CP 399 MixIT grey primer allows different shades of grey to be achieved, allowing the primer colour to be perfectly matched to the basecoat. All available shades can be found in the formulation programme under "Mixing Products".
- Product benefits: Easy to process Very high-filling Smooth surface Good corrosion protection
Specification
WET-ON-WET APPLICATION
VERY HIGH-FILLING
CORROSION PROTECTION
One coat followed by basecoat or direct gloss application taking note of evaporation time between layers
22-35 sek. DIN Cup 4mm
190 μm
~7-8 m2/L
1.5 hrs
1 coat 60-80 μm 2 coats 120-140 μm 3 coats 160-200 μm
P800-P1000
P320-P500
CP 399: 24 months in originally sealed packaging CP 282/ CP 285/ CP 286: 12 months in originally sealed packaging
2004/42/WE IIB(c) (540) 500
Application
Abrade substrate using a red P300-400 abrasive pad by hand or P320 sanding disc using orbital sander. Remove dust particles before cleaning substrate with CP 015. After the substrate is clean and dry apply CP 399 with the required number of layers, taking note of the recommended evaporation time between coats. CP 399 can also be used as W-O-W primer and in this instance only one layer is required but thinning ratio must be increased to 30% CP 040. Bake or airdry before progressing to the next step of the process
4:1 100 parts of CP 399 25 parts of hardener CP 282/ CP 285/ CP 286 10 % of thinner CP 040/ CP 070/ CP 055/ CP 075 20-30 % of thinner CP 040/ CP 070/ CP 055/ CP 075 acc. to wet-on-wet method
Nozzle opening for pneumatic method: 1.6-1.8 mm wet-on-wet method: nozzle 1.2-1.4 mm, Operating pressure: HVLP/RP 2 bars
2-3 full coats
5 min after coating first and second coat at 20°C and 65% relative humidity. Evaporation continues until a matt surface is visible
Drying times at 20°C and 65% relative humidity: - dust dryness: 10 min - before sanding: 3.5-4 hrs Drying times at 40°C and 65% relative humidity: - before sanding: 1 hrs Drying times at 60°C and 65% relative humidity: - before sanding 30 min
before sanding ~30 min