MAX HB Filler

MAX HB Filler

Acrylic primer 2K HS 4:1

MAX HB Filler 4:1 is a 2K acrylic filling primer designed for fast and cost-effective
preparation of parts prior to painting. Its HB (High Build) formula effectively levels minor
surface imperfections, sanding scratches, and marks left after surface preparation,
creating a stable and even layer for subsequent coating systems. The product features
easy application and soft, predictable sanding properties after drying, ensuring consistent
results and saving time in the workshop. It is easy to process, and with sufficiently long
flash-off times, multiple coats can be applied.

Available colors:
  • Product benefits: Easy to process Smooth surface Easy application Efficient High-build

Specification

Agricultural and construction machinery
HIGH-BUILD
Forklift trucks and hoists
EASY APPLICATION
Commercial vehicles and machinery
SMOOTH SURFACE
Buses and truck tractors
EFFICIENT
Technical machinery and equipment
EASY TO PROCESS
SPRAY VISCOSITY

35-55 sec. DIN Flow Cup 4mm 

RECOMMENDED SIZES FOR PAINT STRAINER
190 μm
PAINT EFFICIENCY
~7-8 m2/L
POT LIFE

40 min

DRY FILM THICKNESS

1 coat - 50-60 μm

2 coats - 110-120 μm

3 coats - 170-180 μm

WET SANDING

P800 -> P1000

DRY SANDING

P400 -> P500 

MINIMUM SHELF LIFE

MAX HB Filler: 24 months in originally sealed packaging MAX Multi HS Hardener: 12 months in originally sealed packaging

VOC
2004/42/WE IIB(c) (540) 540

Application

SUBSTRATE PREPARATION

Degrease the surface using CP 015. Apply the primer to sanded coatings using P180-P240 grit sandpaper. When applying to plastics, the use of the CP 390 adhesion promoter is required. 

MIXING RATIO

4:1 

100 parts MAX HB Filler 

25 parts MAX Multi HS Hardener 

When applying to plastics, the use of the CP 490 flex additive is recommended. 

SPRAY GUN SETTINGS

Nozzle: 1,6-1,8 mm; perating pressure: HVLP/RP 1,8-2,0 bara 

APPLICATION

2-3 full coats 

EVAPORATION TIME AFTER APPLICATION

At 20°C and 65% relative humidity: 5 min after applying the 1st and 2nd coat. Flash-off time lasts until a matte surface is achieved. 

DRYING

Drying times at 20°C and 65% relative humidity: 

- dust dryness: 10 min (2 coats) 

- before sanding: 4-4,5 hrs 

Drying times at 60°C and 65% relative humidity: 

- before sanding 25 min 

MSDS

Log in, to view available files.

Sign up for our newsletter

Get a head start with access to unique information about our latest paint products.